The gravel train that is! Trip after trip after trip, bringing in LOTS of road base. We’re getting close now! 😀

May 6

April 3

One final load of pea gravel before the stay home orders went into effect, and the drain tiles are complete.

March 23-25

Sub-base all laser graded and the drain tiles are going in!

March 17-18

January 1-4

Rough graded before winter sets in, so everything can settle well with the weather changes.