All About That Bass, ‘Bout That Bass May 13, 2020 Base. I meant base. 😛 May 13 All laser graded and ready for final smoothing. And then….footing delivery! May 8 Just ONE pile left to spread and our base is fully rough graded into place! May 6 With construction opening back up, the base material was delivered! April 3 One final load of pea gravel before the stay home orders went into effect, and the drain tiles are complete. March 23-25 Sub-base all laser graded and the drain tiles are going in! March 17-18 January 1-4 Rough graded before winter sets in, so everything can settle well with the weather changes.